Daycare/Child Education




Aprende Con Amigos
JHC transformed this former commercial building into a new Spanish Immersion Preschool. Seismic upgrades and tenant improvements of a 3,000 SF single story URM (un-reinforced masonry) building constructed in 1948. Change in occupancy from B “doggy daycare” to E “preschool w/ office & staff areas.” Improve three exits and restrooms to meet accessibility requirements. Tenant improvement consisted of creating three classrooms, two new restrooms, remodeling two restrooms, office space, employee space, new finishes throughout, installation of a fire alarm, new storefront along the entirety of the frontage, and constructing an outdoor playground area.




Guidepost Montessori
Serving infants to elementary grades, programs at Guidepost are defined by the practical application of sensory-based and self-directed learning through the authentic Montessori Method. The original, 4,000 SF, circa 1973 building was solid, but several cost-cutting additions created a few construction challenges throughout the years. Interior elements of a kitchen, bar and massive stone fireplace also needed to be removed for young childhood classrooms and administrative offices. The current roof and framing structure was not seismically safe so JHC added new steel beams to replace some load-bearing walls along with some sheer walls in several areas. After four decades of kitchen grease, steam and humidity some of those steel and wood walls also required complete replacements.




The Goddard School
The Goddard School Project consisted of a complete change of use renovation of a 7,000 SF existing private school into an early childcare facility, including a complete interior renovation, complete structural upgrades, installation of a full commercial kitchen as well as a complete site improvement inclusive of new site utility and exterior recreation facility.




KLA Schools of Hillsboro
KLA Schools of Hillsboro is an innovative early childhood center serving children from eight weeks to five years of age and offering a high-quality Reggio Emilia-inspired education. This project consisted of full ground-up construction including full-off and on-site improvements. The new 12,335 SF building houses 11 classrooms, a commercial kitchen, and a full playground.

Emler Pool

Emler Swim School Project Exterior


Emler Pool
Emler Swim Schools
Emler Swim School (Beaverton) opened their first of two planned locations. The school offers year-round instruction for children from 2 months to 5+ years of age how to become safe swimmers. The 6,200 SF project consisted of adding an ADA-accommodating 1,700 SF indoor pool, six changing rooms, showers and a waiting area for parents. The project features fabric ducting and a wall mural.